Infraestructures de la...
Catalunya. Toyser was commissioned to use a precision measuring trolley to scan a total of 11 railway tunnels on the Zaragoza Barcelona conventional track with an overall length of 5,600 metres.
Toyser provided the technical equipment required for these measurements: an Amberg GRP 5000 railway track trolley with an HDS 6200 scanner and a Leica TS30 total station with 0.5" angular accuracy and 0.6 mm in distance. The work speed was 0.9 km/hour in order to record a point density of 5 x 5 mm.
Customer
- AMBERG INFRAESTRUCTURAS, S.A.
Category
- Services
- Laser scanning
- Aplication Field
- Civil engineering
Date
- 25/07/2012
Related links
Related projects
-
Tacheometric survey for the design of the new...
-
Tacheometric survey of the viaduct over the AP7...
Infraestructures de la...
-
Laser scanning and topography for a water distribution...
AYESA
-
Scanning and creation of a 3D model of the structure...
B:SM - Barcelona de Serveis...
-
Scanning 11 tunnels on the Zaragoza Barcelona...
AMBERG INFRAESTRUCTURAS,...
-
Precision scanning of four tunnels in Las Glòries...
Barcelona d'Infraestructures...
-
Scanning and creation of a 3D model of the base...
Abadia de Montserrat
-
Scanning of the Regajal tunnel on the AVE high-speed...
AMBERG INFRAESTRUCTURAS,...
-
Scanning plane of the Tibidabo amusement park
EIPM
-
Laser-scanning topographic survey of the tunnel...
Fast Consortium UTE